Downloading

Please wait until the download process completes before closing this popup.

Closing this popup before the download process completes will terminate the download.

W51DQV25RA004: CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION

Name Number File/URL Date Document Type Include in Response
Pre_Solicitation_Conference Pre_Solicitation_Conference.pptx 2025-06-12 Attachment No
Site_Visit_Attendance_List_15_May_2025 Site_Visit_Attendance_List_15_May_2025.pdf 2025-06-12 Attachment No
W51DQV25RA004_0003 W51DQV25RA004_0003.pdf 2025-06-12 Attachment No
Update / Notice ID Description Posted Date Response Date
0002 This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Mater 2025/05/07 21:33 UTC 2025-06-17 14:00 Atlantic Standard Time
0001 This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Mater 2025/04/25 19:10 UTC 2025-06-17 14:00 Atlantic Standard Time
W51DQV25RA004 This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Mater 2025/04/09 01:55 UTC 2025-06-17 14:00 Atlantic Standard Time