Name
|
Number
|
File/URL
|
Date
|
Document Type
|
Include in Response
|
Amendment_0003 |
|
Amendment_0003.pdf
|
2023-08-21 |
Attachment
|
No
|
Update / Notice ID |
Description |
Posted Date |
Response Date |
0002
|
The proposed work in the FNP consists of maintenance dredging of the 6foot and 8 feet deep entrance channel and of the 6-foot-deep inner harboranchorage area. The project will require dredging of about 44,000 cubicyards (CY) of mixed sandy and silty |
2023/08/04 11:40 UTC |
2023-08-25 13:00 Eastern Daylight Time |
0001
|
The proposed work in the FNP consists of maintenance dredging of the 6foot and 8 feet deep entrance channel and of the 6-foot-deep inner harboranchorage area. The project will require dredging of about 44,000 cubicyards (CY) of mixed sandy and silty |
2023/07/25 11:55 UTC |
2023-08-23 13:00 Eastern Daylight Time |
W912WJ23B0023
|
The proposed work in the FNP consists of maintenance dredging of the 6foot and 8 feet deep entrance channel and of the 6-foot-deep inner harboranchorage area. The project will require dredging of about 44,000 cubicyards (CY) of mixed sandy and silty |
2023/07/25 11:42 UTC |
2023-08-23 13:00 Eastern Daylight Time |