Downloading

Please wait until the download process completes before closing this popup.

Closing this popup before the download process completes will terminate the download.

W912QR25BA005: EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL

Primary Contact Name


A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
Name Number File/URL Date Document Type Include in Response
Update / Notice ID Description Posted Date Response Date
0002 The scope of the project includes a detailed survey of the area. A geotechnical investigation was conducted to confirm the soil materials and analyze the method of failure. The bank will be cleared of all vegetation. It is proposed to install a ripra 2025/02/19 12:15 UTC 2025-02-20 10:00 Eastern Standard Time
W912QR25BA005 The scope of the project includes a detailed survey of the area. A geotechnical investigation was conducted to confirm the soil materials and analyze the method of failure. The bank will be cleared of all vegetation. It is proposed to install a ripra 2025/01/15 18:10 UTC 2025-02-17 10:00 Eastern Standard Time