Downloading

Please wait until the download process completes before closing this popup.

Closing this popup before the download process completes will terminate the download.


W912PL23B0009: Standby Power Switchgear Reconfiguration, (VA) Long Beach, CA

Primary Contact Name


A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
Name Number File/URL Date Document Type Include in Response
Update / Notice ID Description Posted Date Response Date
0002 Amendment 0002-Instructions to Bidder Updates, Period of Performance Extension - Revision to Clause 52.211-10, Due date for receipt of bids extended to September 14, 2023, Updated SF 1442, Wage Determination updated. The project will convert the exis 2023/09/05 22:02 UTC 2023-09-14 02:00 Pacific Standard Time
0001 The project will convert the existing switchgear to a combined emergency/standby switchgear, which will involve replacing and procuring new 12kV switchgear sections as well as a new smaller low voltage section, to avoid expanding the building. The wo 2023/08/24 16:09 UTC 2023-09-08 02:00 Pacific Standard Time
W912PL23B0009 The project will convert the existing switchgear to a combined emergency/standby switchgear, which will involve replacing and procuring new 12kV switchgear sections as well as a new smaller low voltage section, to avoid expanding the building. The wo 2023/08/09 15:41 UTC 2023-09-08 02:00 Pacific Standard Time