A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
| Update / Notice ID |
Description |
Posted Date |
Response Date |
| 0001
|
The Contractor will furnish all equipment, materials, labor, and completed and approved design to fabricate a push boat and two (2) barges. The contractor will also deliver, outfit, pin, and launch boat and barges. All equipment shall be fully functi |
2023/08/22 14:12 UTC |
2023-09-06 14:00 Central Standard Time |
| W912P523Q0028
|
The Contractor will furnish all equipment, materials, labor, and completed and approved design to fabricate a push boat and two (2) barges. The contractor will also deliver, outfit, pin, and launch boat and barges. All equipment shall be fully functi |
2023/08/14 20:29 UTC |
2023-09-06 14:00 Central Standard Time |