Downloading

Please wait until the download process completes before closing this popup.

Closing this popup before the download process completes will terminate the download.


W912P523B0007: Barkley Dam Site Water and Compressed Air Piping Replacement

Primary Contact Name


A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
Name Number File/URL Date Document Type Include in Response
W912P523B0007_A0001_Barkley_Water_and_Compressed_Air_Lines W912P523B0007_A0001_Barkley_Water_and_Compressed_Air_Lines.pdf 2023-08-22 Attachment No
TSpecs_W912P523B0007_BAR_Water_and_Compressed_Air_Piping_Replacement_AM_001_21AUG23 TSpecs_W912P523B0007_BAR_Water_and_Compressed_Air_Piping_Replacement_AM_001_21AUG23.pdf 2023-08-22 Attachment No
BAR_Dam_Water_and_Compressed_Air_Piping___Pre_Bid_Site_Visit___Sign_in_Sheet BAR_Dam_Water_and_Compressed_Air_Piping___Pre_Bid_Site_Visit___Sign_in_Sheet.pdf 2023-08-22 Attachment No
Update / Notice ID Description Posted Date Response Date
W912P523B0007 The Nashville District, U.S. Army Corps of Engineers, is issuing an Invitation for Bid (IFB) for a firm fixed-price construction contract. The work includes construction of the Barkley Dam Site Water Supply Lines which includes demolishing the existi 2023/07/28 13:46 UTC 2023-08-31 13:00 Central Daylight Time