A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
|
Name
|
Number
|
File/URL
|
Date
|
Document Type
|
Include in Response
|
| Update / Notice ID |
Description |
Posted Date |
Response Date |
| 0002
|
Project work consists of maintenance dredging Palm Beach Harbor within the Entrance Channel, Settling Basin, Extended Settling Basin, and the southern portion of the Expanded Settling Basin. All material is to be placed in the Beach Placement Area lo |
2024/10/11 21:27 UTC |
2024-10-23 13:00 Eastern Standard Time |
| 0001
|
Project work consists of maintenance dredging Palm Beach Harbor within the Entrance Channel, Settling Basin, Extended Settling Basin, and the southern portion of the Expanded Settling Basin. All material is to be placed in the Beach Placement Area lo |
2024/10/02 21:20 UTC |
2024-10-23 13:00 Eastern Standard Time |
| W912EP25B0004
|
Project work consists of maintenance dredging Palm Beach Harbor within the Entrance Channel, Settling Basin, Extended Settling Basin, and the southern portion of the Expanded Settling Basin. All material is to be placed in the Beach Placement Area lo |
2024/09/23 21:45 UTC |
2024-10-23 13:00 Eastern Standard Time |