Toggle navigation
Solicitation
Search
Lookup
Product/Service Codes
NAICS
Documentation
Training and Resources
Exit
W912EP24R0001: CENTRAL EVERGLADES PLANNING PROJECT (CEPP), SOUTH PHASE, CONTRACT 2A, S-356E PUMP STATION AND S-334E SPILLWAY PROJECT, MIAMI-DADE COUNTY, FLORIDA
Solicitation
Solicitation Number
Public Posting Link
Copy To Clipboard
Notice Type
Response Date
Response Date Time Zone
--- Please Select ---
Eastern Daylight Time (-04:00)
Set Aside Code
N/A
Total Small Business Set-Aside
Partial Small Business Set-Aside
8(a) Set-Aside
Historically Underutilized Business (HUBZone) Set-Aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside
Women-Owned Small Business (WOSB) Program Set-Aside
Economically Disadvantaged WOSB (EDWOSB) Program Set-Aside
8(a) Sole Source
Historically Underutilized Business (HUBZone) Sole Source
Service-Disabled Veteran-Owned Small Business (SDVOSB) Sole Source
Women-Owned Small Business (WOSB) Program Sole Source
Economically Disadvantaged WOSB (EDWOSB) Program Sole Source
Local Area Set-Aside
Competitive 8(a)
Economically Disadvantaged Woman Owned Small Business
Emerging Small Business
HUBZone
Partial HBCU / MI
Partial Small Business
Service-Disabled Veteran-Owned Small Business
Total HBCU / MI
Total Small Business
Veteran-Owned Small Business
Woman Owned Small Business
Primary Contact Name
Description
TITLE: CENTRAL EVERGLADES PLANNING PROJECT (CEPP), SOUTH PHASE, CONTRACT 2A, S-356E PUMP STATION AND S-334E SPILLWAY PROJECT, MIAMI-DADE COUNTY, FLORIDADESCRIPTION OF WORK:As noted above, the CEPP South, Contract 2A, S-356E Pump Station and S-334E Spillway project is in western Miami-Dade County at the intersection of the L-29 Canal, the L-30 Canal, and the L-31N Borrow Canal. The structures will be constructed in the L- 29 Canal, adjacent Tamiami Trail (US-41), approximately 1/4 mile east of the existing S-334 Spillway and the temporary S-356 Pump Station. The project work includes excavation, dewatering, blasting, and construction for a new levee system, a new pump station structure, a new spillway structure, and a steel pile bulkhead wall. The overall site is approximately 20 acres, north of the site is Water Control Area 3 (WCA3). Specific major project components include the following items:1. A new levee system located along the northern side of the project site, approximately 1,600-feet long, with a crest width of 16.0 feet with 3H:1V side slopes.2. A new pump station structure has a total pumping capacity of 1,250 cubic feet per second (cfs) that consists of four (4) 250 cfs diesel motor driven pumps and two (2) 125 cfs electric motor driven pumps, superstructure, substructure, service bridge, and vehicle access ramps.3. A new spillway structure with a design capacity of 1,200 cfs with two (2) bays, vertical lift roller gate, and a service bridge.4. Both structures will have an anchored steel pile bulkhead wall located at the intake bay and discharge of the pump station5. The installation of rip rap slope protection along the canal banks and canal bottom of the L-29 canal. The estimated period of performance is 2548 calendar days after issuance of Notice to Proceed with 90 days to commence performance after award.****Offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements in accordance with FAR 22.504, General requirements for project labor agreements. Any PLA reached pursuant to the PLA requirements in the solicitation does not change the terms of the contract or provide for any price adjustment by the Government.******Pre-proposal conference information will be provided on a later date.***PROPOSAL REQUIREMENTS: Award will be made to the offeror whose proposal represents the best value to the Government utilizing the Best Value Tradeoff Process. Proposals will be evaluated in the areas of Technical Merit, Past Performance, Small Business Participation, and Price. A fourth non-price factor will be assessed by the Government: namely, the submission of a Project Labor Agreement. The anticipated magnitude of construction per DFARS 236.204 is between $100,000,000 and $250,000,000.THIS SOLICITATION IS UNRESTRICTED. This solicitation will issued on or about Friday, 22 March 2024 with receipt of proposals on or about Monday, 06 May 2024. Solicitation will be issued in electronic format only and will be posted on the Procurement Integrated Enterprise Environment (PIEE) website. The PIEE website can be found at https://piee.eb.mil/In order to receive notification of any amendments to the solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the sam.gov website. If you are not registered, the Government is not responsible with providing you with notification of any changes to the solicitation. You must be registered in the System for Award Management (SAM) in order to receive an award from the solicitation. The SAM website can be located at https://sam.gov.The Pre-proposal Conference information will be provided with the solicitation posting.
Solicitation Details
Subject
Posting Date
Archive Date
Product or Service Code
NAICS
Place of Performance Zip Code
Place of Performance Address
Miami-Dade, FL
Recovery Act
Yes
No
Contract Information
Contracting Office DoDAAC
--- Please Select ---
W912EP
Contracting Office Name
Contracting Office Address
KO CONTRACTING DIVISION 701 SAN MARCO BLVD JACKSONVILLE FL 32207-8175 JACKSONVILLE FL 32207-8175 USA
Attachments
Name
Number
File/URL
Date
Document Type
Include in Response
DRAFT_24R0001CEPP2A356E334EVolume2Specs_RTA
DRAFT_24R0001CEPP2A356E334EVolume2Specs_RTA.pdf
2024-03-13
Attachment
No
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_1
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_1.pdf
2024-03-13
Attachment
No
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_2
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_2.pdf
2024-03-13
Attachment
No
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_3
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_3.pdf
2024-03-13
Attachment
No
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_4
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_4.pdf
2024-03-13
Attachment
No
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_5
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_5.pdf
2024-03-13
Attachment
No
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_6
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_6.pdf
2024-03-13
Attachment
No
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_7
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_7.pdf
2024-03-13
Attachment
No
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_8
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_8.pdf
2024-03-13
Attachment
No
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_9
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_9.pdf
2024-03-13
Attachment
No
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_10
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_10.pdf
2024-03-13
Attachment
No
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_11
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_11.pdf
2024-03-13
Attachment
No
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_12
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_12.pdf
2024-03-13
Attachment
No
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_13
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_13.pdf
2024-03-13
Attachment
No
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_14
DRAFT_24R0001CEPP2A356ES334E_Plans_RTA_1_11_2024Part_14.pdf
2024-03-13
Attachment
No
DRAFT_APL_95_1_1_USACE_Aviation_Policies_and_Standards__1_
DRAFT_APL_95_1_1_USACE_Aviation_Policies_and_Standards__1_.pdf
2024-03-13
Attachment
No
DRAFT_SDD_and_ERD_Sample__1_
DRAFT_SDD_and_ERD_Sample__1_.pdf
2024-03-13
Attachment
No
Amendments / Solicitation
Amendment / Solicitation Number
Description
Posted Date
Response Date
0002
TITLE: CENTRAL EVERGLADES PLANNING PROJECT (CEPP), SOUTH PHASE, CONTRACT 2A, S-356E PUMP STATION AND S-334E SPILLWAY PROJECT, MIAMI-DADE COUNTY, FLORIDADESCRIPTION OF WORK:As noted above, the CEPP South, Contract 2A, S-356E Pump Station and S-334E Sp
2024/06/11 16:18 UTC
2025-01-16 14:00 Eastern Daylight Time
0001
The purpose of this amendment is to upload Draft Plans and Specifications.TITLE: CENTRAL EVERGLADES PLANNING PROJECT (CEPP), SOUTH PHASE, CONTRACT 2A, S-356E PUMP STATION AND S-334E SPILLWAY PROJECT, MIAMI-DADE COUNTY, FLORIDADESCRIPTION OF WORK:As n
2024/03/14 11:59 UTC
2024-05-06 14:00 Eastern Daylight Time
Please Wait
Session Timeout