Downloading

Please wait until the download process completes before closing this popup.

Closing this popup before the download process completes will terminate the download.


W912DQ23R4017: Natural Gas Line Installation - Construction, Fort Leavenworth, Kansas

Primary Contact Name


A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
Name Number File/URL Date Document Type Include in Response
B_08_03__AMD0002__gas_line_04Aug2023_PIEE_SAM B_08_03__AMD0002__gas_line_04Aug2023_PIEE_SAM.pdf 2023-08-04 Attachment No
amd_2_plans amd_2_plans.pdf 2023-08-04 Attachment No
Update / Notice ID Description Posted Date Response Date
0002 Install approximately 1-1/4 miles of new natural gas main by open trench, horizontal directional drilling, and boring.Construct a new natural gas city gate adjacent to the Visitor Control Center. Repair/replace existing natural gas city gate, pressur 2023/07/20 17:34 UTC 2023-08-17 11:00 Central Standard Time
0001 Install approximately 1-1/4 miles of new natural gas main by open trench, horizontal directional drilling, and boring.Construct a new natural gas city gate adjacent to the Visitor Control Center. Repair/replace existing natural gas city gate, pressur 2023/07/12 15:15 UTC 2023-07-20 11:00 Central Standard Time
W912DQ23R4017 Install approximately 1-1/4 miles of new natural gas main by open trench, horizontal directional drilling, and boring.Construct a new natural gas city gate adjacent to the Visitor Control Center. Repair/replace existing natural gas city gate, pressur 2023/06/15 18:21 UTC 2023-07-20 11:00 Central Standard Time