Downloading

Please wait until the download process completes before closing this popup.

Closing this popup before the download process completes will terminate the download.

W912BV25R0008: WD Mayo Alignment Cell

Primary Contact Name


A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
Name Number File/URL Date Document Type Include in Response
Update / Notice ID Description Posted Date Response Date
0004 This is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14 which is part of the McClellan-Kerr Arkansas River Navigation System (MKARNS). 2025/09/19 20:02 UTC 2025-10-06 14:00 Central Standard Time
0003 This is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14 which is part of the McClellan-Kerr Arkansas River Navigation System (MKARNS). 2025/09/10 13:39 UTC 2025-09-22 14:00 Central Standard Time
0002 This is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14 which is part of the McClellan-Kerr Arkansas River Navigation System (MKARNS). 2025/08/25 15:30 UTC 2025-09-22 14:00 Central Standard Time
0001 This is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14 which is part of the McClellan-Kerr Arkansas River Navigation System (MKARNS). 2025/03/31 19:47 UTC 2025-04-14 14:00 Central Standard Time
W912BV25R0008 This is a Design-Build Request for Proposal (RFP) to design and construct a replacement guide wall extension cell at the W.D. Mayo Lock and Dam 14 which is part of the McClellan-Kerr Arkansas River Navigation System (MKARNS). 2025/03/07 20:31 UTC 2025-04-07 14:00 Central Standard Time