Downloading

Please wait until the download process completes before closing this popup.

Closing this popup before the download process completes will terminate the download.


W912BV24R0117: Sam Rayburn Switchyard Repairs

Primary Contact Name


A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
Name Number File/URL Date Document Type Include in Response
Solicitation_Amendment_0003_24R0117_Sam_Rayburn Solicitation_Amendment_0003_24R0117_Sam_Rayburn.pdf 2025-05-21 Attachment No
Update / Notice ID Description Posted Date Response Date
0002 This project involves repairing transmission tower foundations that have been structurally compromised over their 60-year lifetime. The primary goal of this retrofit will be to eliminate the ability of moisture to collect and remain between the base 2025/01/28 19:45 UTC 2025-02-13 14:00 Central Standard Time
0001 This project involves repairing transmission tower foundations that have been structurally compromised over their 60-year lifetime. The primary goal of this retrofit will be to eliminate the ability of moisture to collect and remain between the base 2025/01/25 00:31 UTC 2025-02-13 14:00 Central Standard Time
W912BV24R0117 This project involves repairing transmission tower foundations that have been structurally compromised over their 60-year lifetime. The primary goal of this retrofit will be to eliminate the ability of moisture to collect and remain between the base 2025/01/13 20:46 UTC 2025-02-13 14:00 Central Standard Time