Downloading

Please wait until the download process completes before closing this popup.

Closing this popup before the download process completes will terminate the download.

W912BU24B0010: PERIODIC BEACH RENOURISHMENT MANASQUAN INLET TO BARNEGAT INLET, NJ

Primary Contact Name


A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
Name Number File/URL Date Document Type Include in Response
24b0010_Amend_0004 24b0010_Amend_0004.pdf 2024-07-09 Attachment No
24b0010_Amend_0003 24b0010_Amend_0003.pdf 2024-07-09 Attachment No
Update / Notice ID Description Posted Date Response Date
0003 ***Amendment U0003 is to address the conflicting bid opening times between PIEE and SAM. The Bid Opening date and time is hereby revised/extended to 10 July 2024 at 1100 EST. The Period of Performance is also confirmed at 270 days.***Amendment U0002 2024/07/09 18:16 UTC 2024-07-10 11:00 Eastern Standard Time
0002 ***Amendment U0002 is to address RFIs, remove the Draft watermark label from Amendment 0001, update Specs, Drawings and update the Bidding Schedule. The due date is extended to 9 July 2024 at 1100 EST. Also the Government now has up to 30 days to rev 2024/06/21 11:24 UTC 2024-07-09 11:00 Eastern Standard Time
0001 ***Amendment U00001 is to account for Clause 52.236-4 which stipulates Physical Data information. All other terms and conditions remain unchanged--including the due date and time. ***The U.S. Army Corps of Engineers, Philadelphia District (NAP) has a 2024/06/05 18:41 UTC 2024-06-28 14:00 Eastern Standard Time
W912BU24B0010 The U.S. Army Corps of Engineers, Philadelphia District (NAP) has a requirement (W912BU24B0010) to perform periodic beach nourishment as authorized for theManasquan Inlet to Barnegat Inlet Coastal Storm Risk Management Project (CSRM). The project pro 2024/05/29 18:30 UTC 2024-06-28 14:00 Eastern Standard Time