Downloading

Please wait until the download process completes before closing this popup.

Closing this popup before the download process completes will terminate the download.

W9128F25R0011: B-21 60 Row Environmental Protection Shelters - North

Primary Contact Name


A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
Name Number File/URL Date Document Type Include in Response
W9128F25R0011_Am0005 W9128F25R0011_Am0005.pdf 2025-03-20 Attachment No
Update / Notice ID Description Posted Date Response Date
0004 Am-0004: The purpose of this amendment is to provide updated drawings/specifications. // Am-0003: The purpose of this amendment is to extend the proposal due date, update the wage determinations, revise the DIV 00 21 00/00 22 00/00 72 00, and provide 2025/02/27 16:23 UTC 2025-03-27 14:00 Central Standard Time
0003 Am-0003: The purpose of this amendment is to extend the proposal due date, update the wage determinations, revise the DIV 00 21 00/00 22 00/00 72 00, and provide updated drawings/specifications // Am-0002: The purpose of this amendment is to extend t 2025/02/20 19:46 UTC 2025-03-27 14:00 Central Standard Time
0002 Am-0002: The purpose of this amendment is to extend the proposal due date, update wage determinations, revise the DIV 00 22 00, update the specs/drawings, and provide the Industry Day slides/attendance roster // Am-0001: The purpose of this amendmen 2025/02/07 21:31 UTC 2025-03-18 14:00 Central Standard Time
0001 Am-0001: The purpose of this amendment is to update the wage determinations, revise the DIV 00 22 00, provide the site visit sign-in sheet, and revise the drawings/specifications. // This project will provide five (5) new pre-engineered metal Envir 2025/01/28 20:34 UTC 2025-02-25 14:00 Central Standard Time
W9128F25R0011 This project will provide five (5) new pre-engineered metal Environmental Protection Shelters (EPS), approximately 20,000 SF each. EPS’s are sized to fit the B-2A “Spirit” aircraft with space to perform general aircraft maintenance. The project also 2025/01/03 14:43 UTC 2025-02-25 14:00 Central Standard Time