Downloading

Please wait until the download process completes before closing this popup.

Closing this popup before the download process completes will terminate the download.

W9127824R0026: Final Denial Barriers South Gate

Primary Contact Name


A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
Name Number File/URL Date Document Type Include in Response
W9127824R0026_0003_SF30 W9127824R0026_0003_SF30.pdf 2024-06-03 Attachment No
Update / Notice ID Description Posted Date Response Date
0002 This project is to construct South Entry Control Point (ECP) at Patrick SFB, FL including final denial barriers at the 45 SW South Entry Gate on S Patrick Drive; and at entrance to Marina Road; overwatch facility, cable barrier system along S Patrick 2024/05/24 19:54 UTC 2024-06-05 14:00 Central Daylight Time
0001 This project is to construct South Entry Control Point (ECP) at Patrick SFB, FL including final denial barriers at the 45 SW South Entry Gate on S Patrick Drive; and at entrance to Marina Road; overwatch facility, cable barrier system along S Patrick 2024/05/09 20:20 UTC 2024-05-29 14:00 Central Daylight Time
W9127824R0026 This project is to construct South Entry Control Point (ECP) at Patrick SFB, FL including final denial barriers at the 45 SW South Entry Gate on S Patrick Drive; and at entrance to Marina Road; overwatch facility, cable barrier system along S Patrick 2024/04/12 20:56 UTC 2024-05-20 14:00 Central Daylight Time