A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
|
Name
|
Number
|
File/URL
|
Date
|
Document Type
|
Include in Response
|
| W9127824R0026_0003_SF30 |
|
W9127824R0026_0003_SF30.pdf
|
2024-06-03 |
Attachment
|
No
|
| Update / Notice ID |
Description |
Posted Date |
Response Date |
| 0002
|
This project is to construct South Entry Control Point (ECP) at Patrick SFB, FL including final denial barriers at the 45 SW South Entry Gate on S Patrick Drive; and at entrance to Marina Road; overwatch facility, cable barrier system along S Patrick |
2024/05/24 19:54 UTC |
2024-06-05 14:00 Central Daylight Time |
| 0001
|
This project is to construct South Entry Control Point (ECP) at Patrick SFB, FL including final denial barriers at the 45 SW South Entry Gate on S Patrick Drive; and at entrance to Marina Road; overwatch facility, cable barrier system along S Patrick |
2024/05/09 20:20 UTC |
2024-05-29 14:00 Central Daylight Time |
| W9127824R0026
|
This project is to construct South Entry Control Point (ECP) at Patrick SFB, FL including final denial barriers at the 45 SW South Entry Gate on S Patrick Drive; and at entrance to Marina Road; overwatch facility, cable barrier system along S Patrick |
2024/04/12 20:56 UTC |
2024-05-20 14:00 Central Daylight Time |