W9123823R0030: USACE SPK DB Construction – East 388th Apron Repair, Hill AFB, UT.

Name Number File/URL Date Document Type Include in Response
Attachment___1_Drawings_Dated_24_March_2024 Attachment___1_Drawings_Dated_24_March_2024.pdf 2023-04-25 Attachment No
Attachment___2__Specifications_2450_dated_24_March_2023 Attachment___2__Specifications_2450_dated_24_March_2023.pdf 2023-04-25 Attachment No
Attachment___3_Past_Performance_Questionnaire Attachment___3_Past_Performance_Questionnaire.pdf 2023-04-25 Attachment No
Attachment___4_Project_Information_Form Attachment___4_Project_Information_Form.pdf 2023-04-25 Attachment No
Attachment___5_Wage_Determination Attachment___5_Wage_Determination.pdf 2023-04-25 Attachment No
PIEE_Instructions PIEE_Instructions.pdf 2023-04-27 Attachment No
W9123823R0030 W9123823R0030.pdf 2023-04-27 Attachment No
Amendment Number Description Posted Date Response Date
0001 USACE SPK 2 Phase DB Construction – East 388th Apron Repair, Hill AFB, UT. Replacement of approximately 735,000 square feet of existing Portland Cement Concrete (PCC) pavement, along with full rework of structural base materials to include the additi 2023/05/08 17:36 UTC 2023-05-30 10:00 Mountain Daylight Time
0002 USACE SPK 2 Phase DB Construction – East 388th Apron Repair, Hill AFB, UT. Replacement of approximately 735,000 square feet of existing Portland Cement Concrete (PCC) pavement, along with full rework of structural base materials to include the additi 2023/05/09 22:36 UTC 2023-05-30 10:00 Mountain Daylight Time
0003 USACE SPK 2 Phase DB Construction – East 388th Apron Repair, Hill AFB, UT. Replacement of approximately 735,000 square feet of existing Portland Cement Concrete (PCC) pavement, along with full rework of structural base materials to include the additi 2023/05/23 20:58 UTC 2023-05-30 10:00 Mountain Daylight Time