Downloading

Please wait until the download process completes before closing this popup.

Closing this popup before the download process completes will terminate the download.


W9123624B2010: Building 34 Chiller Replacement

Primary Contact Name


A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
Name Number File/URL Date Document Type Include in Response
Amendment_0005_W9123624B2010 Amendment_0005_W9123624B2010.pdf 2024-02-27 Attachment No
Amendment_0006___W9123624B2010_02272024 Amendment_0006___W9123624B2010_02272024.pdf 2024-02-27 Attachment No
Update / Notice ID Description Posted Date Response Date
0005 02/23/2024: Amendment 0005 posted to correct bid due date from 26 February 2024 to 28 February 2024. There is NO ATTACHMENT associated with this amendment as it is administrative only.02/21/2024: Amendment 0004 posted, please see attachment. 02/15/20 2024/02/23 18:09 UTC 2024-02-28 14:00 Eastern Standard Time
0004 02/21/2024: Amendment 0004 posted, please see attachment. 02/15/2024: Amendment 0003 posted, please see attachment. 02/07/2024: Amendment 0002 posted, please see attachment. 02/01/2024: Amendment 0001 posted, please see attachment. The work will incl 2024/02/21 21:16 UTC 2024-02-26 14:00 Eastern Standard Time
0003 02/15/2024: Amendment 0003 posted, please see attachment. 02/07/2024: Amendment 0002 posted, please see attachment. 02/01/2024: Amendment 0001 posted, please see attachment. The work will include demolishing Building 34 existing chilled water equipme 2024/02/15 20:51 UTC 2024-02-26 14:00 Eastern Standard Time
0002 02/07/2024: Amendment 0002 posted, please see attachment. 02/01/2024: Amendment 0001 posted, please see attachment. The work will include demolishing Building 34 existing chilled water equipment, which includes but not limited to: water cooled chille 2024/02/07 12:58 UTC 2024-02-26 14:00 Eastern Standard Time
0001 02/01/2024: Amendment 0001 posted, please see attachment. The work will include demolishing Building 34 existing chilled water equipment, which includes but not limited to: water cooled chiller, cooling tower, and pumps located in two mechanical room 2024/02/01 14:25 UTC 2024-02-26 14:00 Eastern Standard Time
W9123624B2010 The work will include demolishing Building 34 existing chilled water equipment, which includes but not limited to: water cooled chiller, cooling tower, and pumps located in two mechanical rooms adjacent to the building entrance and replace with a sim 2024/01/25 19:03 UTC 2024-02-26 14:00 Eastern Standard Time