Downloading

Please wait until the download process completes before closing this popup.

Closing this popup before the download process completes will terminate the download.


W911XK23B0007: FY23 Duluth Superior Harbor Maintenance Dredging

Primary Contact Name


A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
Name Number File/URL Date Document Type Include in Response
20230623_RFIs_updated 20230623_RFIs_updated.pdf 2023-06-26 Attachment No
Update / Notice ID Description Posted Date Response Date
0003 This amendment is to provide the survey information. There is no amendment 0002, system error. Files can be found at this link https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911XK23B0007 2023/06/23 21:20 UTC 2023-06-29 14:00 Eastern Daylight Time
0001 This amendment is to provide the ProjNet print out. The system will not allow .gen or xyz files that pertain to the survey data. SAM may allow these types of files. Please, check SAM. 2023/06/20 19:33 UTC 2023-06-29 14:00 Eastern Standard Time
W911XK23B0007 The project is for maintenance dredging in Duluth Harbor. Mobilize to the Duluth-Superior Harbor. Dredge between the upstream and downstream limits indicated on the contract drawings. Place all dredged material at theErie Pier CDF as specified. If op 2023/05/30 15:14 UTC 2023-06-29 14:00 Eastern Standard Time