Toggle navigation
Solicitation
Search
Lookup
Product/Service Codes
NAICS
Documentation
Training and Resources
Exit
W911WN23B8005: Hydraulic System Replacement, Pike Island Locks and Dam
Solicitation
Solicitation Number
Public Posting Link
Copy To Clipboard
Notice Type
Response Date
Response Date Time Zone
--- Please Select ---
Eastern Daylight Time (-04:00)
Set Aside Code
N/A
Total Small Business Set-Aside
Partial Small Business Set-Aside
8(a) Set-Aside
Historically Underutilized Business (HUBZone) Set-Aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside
Women-Owned Small Business (WOSB) Program Set-Aside
Economically Disadvantaged WOSB (EDWOSB) Program Set-Aside
8(a) Sole Source
Historically Underutilized Business (HUBZone) Sole Source
Service-Disabled Veteran-Owned Small Business (SDVOSB) Sole Source
Women-Owned Small Business (WOSB) Program Sole Source
Economically Disadvantaged WOSB (EDWOSB) Program Sole Source
Local Area Set-Aside
Competitive 8(a)
Economically Disadvantaged Woman Owned Small Business
Emerging Small Business
HUBZone
Partial HBCU / MI
Partial Small Business
Service-Disabled Veteran-Owned Small Business
Total HBCU / MI
Total Small Business
Veteran-Owned Small Business
Woman Owned Small Business
Primary Contact Name
Description
The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the replacement of the central hydraulic system for the Main and Auxiliary Lock Chambers at Pike Island Locks and Dam, Ohio River, West Virginia. The contract will include a new four-corner hydraulic system for each lock chamber consisting of Hydraulic Power Units (HPUs) for the miter gates and culvert filling/emptying valves. The new HPUs shall be located in new precast buildings at the following locations: •Two (2) HPUs on the river wall; one upstream and one downstream for operation of the Main Chamber culvert valves and miter gates. •Two (2) HPUs on the middle wall; one upstream and one downstream for operation of Main Chamber culvert valves and miter gates. In addition, the two HPUs on the middle wall are for operation of the Auxiliary Chamber miter gates. The modified four-corner system reduces the number of HPUs on the middle wall from four to two. •Two (2) HPUs on the land wall; one upstream and one downstream for operation of the Auxiliary Chamber culvert valves and miter gates. The contract specifically includes: a.Installation of new power, control, and fiber optic cables for the six (6) HPUs. Includes modifying the existing control stations in each control shelter for the addition of the new HPUs and miter gate controls. Includes installation of a new operator control station in the middle wall Operations Building. b. Furnishing and installation of six (6) HPUs, stainless steel hydraulic piping, and hydraulic oil. c. Furnishing and installation of six (6) precast buildings which includes raised concrete pads, power distribution equipment, associated electronics and hardware, and new utility trench covers in various areas of the lock. d. Furnishing and installation of new Motor Control Center (MCC) distribution equipment. e. Demolition and disposal of existing central hydraulic system located in the middle wall Operations Building. This includes all motors, pumps, reservoir, filters, associated piping, and proper disposal of hydraulic oil. f. Demolition and removal of all existing central hydraulic oil lines on the river, middle, and land walls. This includes all lines for pressure and return to each miter gate and culvert valve cylinder. Removal and proper disposal of hydraulic oil and components will be required. Removal and proper disposal of electrical equipment will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable. Construction work will occur in close proximity to waterway traffic and operating lock and dam gates. The existing lock chambers and dams are currently operated and staffed by Government personnel 24 hours a day 365 days of the year. Lock closures for installation and testing of new equipment will be required to be minimal and at the approval of Government.
Solicitation Details
Subject
Posting Date
Archive Date
Product or Service Code
NAICS
Place of Performance Zip Code
Place of Performance Address
Pike Island Locks and Dam 3709 Warwood Ave Wheeling, WV 26003-9776
Recovery Act
Yes
No
Contract Information
Contracting Office DoDAAC
--- Please Select ---
W911WN
Contracting Office Name
Contracting Office Address
KO CONTRACTING DIV WMFM 1000 LIBERTY AVE RM 727 PITTSBURGH PA 15222-4198 PITTSBURGH PA 15222-4198 USA
Attachments
Name
Number
File/URL
Date
Document Type
Include in Response
Attachment_01___Technical_Specifications__Pike_Island_Hydraulic_System_Upgrade
Attachment_01___Technical_Specifications__Pike_Island_Hydraulic_System_Upgrade.pdf
2022-11-15
Attachment
No
Attachment_02___Contract_Drawings___Pike_Island_Hydraulic_System_Replacement
Attachment_02___Contract_Drawings___Pike_Island_Hydraulic_System_Replacement.pdf
2022-11-15
Attachment
No
Attachment_03___Reference_Drawings___Pike_Island_Hydraulic_System_Replacement
Attachment_03___Reference_Drawings___Pike_Island_Hydraulic_System_Replacement.pdf
2022-11-15
Attachment
No
Attachment_04___Wage_Determination_WV20220073_20220225
Attachment_04___Wage_Determination_WV20220073_20220225.pdf
2022-11-15
Attachment
No
Attachment_05___LRP_Security_Information_Sheet___CUI__May_22_1
Attachment_05___LRP_Security_Information_Sheet___CUI__May_22_1.xlsx
2022-11-15
Attachment
No
Attachment_06___SF1442_Solicitation___Pike_Island_Hydraulic_System_Replacement
Attachment_06___SF1442_Solicitation___Pike_Island_Hydraulic_System_Replacement.pdf
2022-11-15
Attachment
No
Amendments
Amendment Number
Description
Posted Date
Response Date
0001
The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the replacement of the central hydraulic system for the Main and Auxiliary Lock Chambers at Pike Island Locks and Dam, Ohio River, West Virginia. The contract will inc
2022/11/22 20:33 UTC
2022-12-15 11:00 Eastern Standard Time
0002
The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the replacement of the central hydraulic system for the Main and Auxiliary Lock Chambers at Pike Island Locks and Dam, Ohio River, West Virginia. The contract will inc
2022/12/12 19:29 UTC
2022-12-15 11:00 Eastern Standard Time
Please Wait
Session Timeout