Downloading

Please wait until the download process completes before closing this popup.

Closing this popup before the download process completes will terminate the download.

W911KB24R0027: Proposal Due Date Extension

Primary Contact Name


A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
Name Number File/URL Date Document Type Include in Response
EIE430_AMD__5_10_JUN_2024 EIE430_AMD__5_10_JUN_2024.pdf 2024-06-10 Attachment No
10791186_photo_1 10791186_photo_1.JPG 2024-06-10 Attachment No
10791186_photo_2 10791186_photo_2.JPG 2024-06-10 Attachment No
10791186_photo_3 10791186_photo_3.JPG 2024-06-10 Attachment No
10791186_recond_drawing 10791186_recond_drawing.pdf 2024-06-10 Attachment No
10809374_Cut_Sheets 10809374_Cut_Sheets.pdf 2024-06-10 Attachment No
EIE430_STRUCT_AM_03 EIE430_STRUCT_AM_03.pdf 2024-06-10 Attachment No
Update / Notice ID Description Posted Date Response Date
0004 Extend the proposal due date from 4 June 2024, 2:00PM Alaska Time, to 13 June 2024, 2:00PM Alaska Time. 2024/06/05 19:34 UTC 2024-06-13 14:00 Alaska Standard Time
0003 Extend the proposal due date from 4 June 2024, 2:00PM Alaska Time, to 13 June 2024, 2:00PM Alaska Time. 2024/05/31 13:43 UTC 2024-06-04 14:00 Alaska Standard Time
0002 Section 00 21 00 and 00 22 11 Changes and As-Built Drawings 2024/05/25 06:06 UTC 2024-06-04 14:00 Alaska Standard Time
0001 Proposal due date extension, bidder inquiry deadline, second site visit information, and the Eielson AFB Installation Facility Standards Guide for EIE430, Repair Fire Protection System In Hangar (B1348), Eielson AFB, Alaska. 2024/05/14 22:41 UTC 2024-05-21 14:00 Alaska Standard Time
W911KB24R0027 Specifications and Drawings for EIE430, Repair Fire Protection System In Hangar (B1348), Eielson AFB, Alaska. 2024/04/19 23:38 UTC 2024-05-21 14:00 Alaska Standard Time