Downloading

Please wait until the download process completes before closing this popup.

Closing this popup before the download process completes will terminate the download.


SP330024B0002: Upgrade Lighting – Warehouse 6 and 21

Primary Contact Name


A Material Safety Data Sheet (MSDS) must be attached to offer submissions in accordance with FAR Clause 52.223-3.
Name Number File/URL Date Document Type Include in Response
SP330024B00020003 SP330024B00020003.pdf 2024-08-23 Attachment No
Attachment_2_SOW_Amend3_Lighting_Upgrades_WH_6__21_Rev_1 Attachment_2_SOW_Amend3_Lighting_Upgrades_WH_6__21_Rev_1.pdf 2024-08-23 Attachment No
Attachment_4_Project_Drawings_Lighting_Upgrades_WH_6___21_REV_1 Attachment_4_Project_Drawings_Lighting_Upgrades_WH_6___21_REV_1.pdf 2024-08-23 Attachment No
Bid_Abstract_24B0002_S Bid_Abstract_24B0002_S.pdf 2024-08-28 Attachment No
Update / Notice ID Description Posted Date Response Date
0002 Amendment 0002 provides second Site Visit, another opportunity for questions and changes Bid date to 27AUG24. Contractor is to furnish all labor, management, supervision, tools, materials, equipment, and transportation to “Upgrade Lighting – Warehous 2024/08/13 19:02 UTC 2024-08-27 13:00 Eastern Daylight Time
0001 Contractor is to furnish all labor, management, supervision, tools, materials, equipment, and transportation to “Upgrade Lighting – Warehouse 6 and 21” at DDJC with all the required components over the identified work areas. This project is 100% Wome 2024/07/31 15:17 UTC 2024-08-20 13:00 Eastern Daylight Time
SP330024B0002 Contractor is to furnish all labor, management, supervision, tools, materials, equipment, and transportation to “Upgrade Lighting – Warehouse 6 and 21” at DDJC with all the required components over the identified work areas. This project is 100% Wome 2024/07/15 18:18 UTC 2024-08-16 13:00 Eastern Daylight Time